Your move

Send us your drawings.

Share your plans, your site address and your rough timeline. We will come back with an itemised quote. No obligation, and we reply within two working days.

This opens your mail app with everything filled in. Or write to us directly at Project@emmagroups.com.

Office

3 Ang Mo Kio Street 62
#01-54 Link@AMK
Singapore 569139

+65 6463 7738
Project@emmagroups.com

Site visits by appointment. Bring your drawings if you have them, at any stage of completion.

Questions

The ones every owner asks before appointing a contractor.

How long does a landed rebuild take in Singapore?

A full rebuild typically runs 12 to 18 months on site, after submissions are approved. The programme depends on the structural system, the site access and the level of finish. We confirm a programme at tender and report against it weekly.

What is the difference between A&A and reconstruction?

A&A keeps the existing structure largely intact and alters or extends parts of it. Reconstruction rebuilds most of the house while keeping some existing elements. The classification affects approvals, cost and timeline, and we advise on which route fits your plans during the site visit.

Do you handle BCA and URA submissions?

Yes. Authority submissions are part of our scope as main contractor, coordinated with your architect and professional engineer.

Can you work with my own architect or interior designer?

That is our preferred way of working. Most of our projects are appointed under the owner's architect, and we build to their drawings and details.

How do you handle variations and cost overruns?

Variations are priced and agreed in writing before the work proceeds. Our quotes itemise provisional sums openly so you can see where the uncertainty sits from day one.

What does your quote include, and what is excluded?

The quote is itemised against the bill of quantities and states inclusions, exclusions and provisional sums explicitly. Nothing is buried in a lump sum.

Are you licensed to build a two storey landed house?

Yes. We hold a BCA General Builder Class 2 licence and CRS General Building C3 registration, which cover landed residential construction in Singapore.

Do you provide a defects liability period?

Yes. A defects liability period follows handover, during which we rectify defects at no cost. The duration is stated in the contract.